01908 714446 Get Free Quote
Car park with multiple EV chargers, UK business setting
Commercial EV charging — designed, installed and certified

Commercial EV Charging Installation in Milton Keynes

From a single workplace point to a 40-socket fleet depot — we design, install and certify commercial EV charging across Milton Keynes and Buckinghamshire. Load balancing, OCPP and full certification.

Up to 40 sockets per site
Up to £500 Per socket WCS grant, claimed by you
BS 7671 Installed and certified
From £900 Single point installed
MCS, NAPIT & RECC Insurance & warranty valid
5-Star Rated Across Google & Trustpilot
Free Survey Within 48 hours
Based in Milton Keynes Genuinely local
2-Year Warranty On all workmanship

Who we work with

Offices

Single point to multi-bay car park installs for staff and visitor charging.

Retail & hospitality

Customer-facing chargers — pay-to-charge or free as a footfall driver.

Housing developers

New-build car parks and multi-dwelling unit (MDU) installations.

Logistics & fleet

Depot overnight charging with OCPP fleet management.

Car dealerships

Customer test-drive charging and showroom installations.

Local authorities

Public car parks and council fleet vehicle charging.

The Workplace Charging Scheme

The OZEV Workplace Charging Scheme (WCS) is a government grant offering up to £500 per socket, up to 40 sockets per business — so up to £20,000 per business.

To qualify:

  • Be a registered UK business, charity or public sector organisation
  • Have dedicated off-street parking
  • Use an installer authorised for the scheme
  • Install OZEV-approved charge points — the hardware we fit is on the approved list

We do not claim the WCS on your behalf. Depth of Light is OZEV-authorised for residential schemes only, so the workplace claim is one you make yourself. The scheme runs to 31 March 2027 — see GOV.UK: Workplace Charging Scheme for the current rules.

Charger options for commercial use

ChargerSpeedBest for
Zaptec Pro7.4-22 kWMulti-bay car parks with load balancing
OHME Pro7.4 kWSmart-tariff aware workplaces
Hypervolt Commercial7.4 kWSingle point or small workplace
Anderson A2 Commercial7.4-22 kWThree-phase sites, branded enclosures
Tesla Wall Connector Gen 3 Commercial7.4-22 kWTesla-only fleets
EO Genius / EO Mini Pro7.4-22 kWHeavy-duty fleet depot use

All chargers we install are OCPP 1.6 or 2.0 compatible — you're not locked into a single management platform.

The commercial install process

  1. Site survey — we visit, look at parking layout, electrical supply, cable runs and DNO capacity
  2. Load assessment — calculate maximum simultaneous load, decide if load balancing or supply upgrade is needed
  3. DNO application (if needed) — most installs over 3 chargers need DNO sign-off; we handle this
  4. Installation — typically 1-3 days depending on size; minimal disruption to business operations
  5. Commissioning & testing — full electrical test, functional test of every socket
  6. 12-month support — included with every commercial install

Fleet depot & high-volume charging

For fleet operators we install:

  • OCPP-compatible management software — track usage per vehicle, per driver, per cost centre
  • Smart load balancing — share available grid capacity dynamically across chargers, avoiding expensive DNO upgrades
  • Cost-per-mile reporting — automatic monthly reports for finance and fleet management
  • RFID access control — only authorised drivers can charge; integration with HR systems
  • Tariff scheduling — charge overnight on commercial off-peak tariffs only

Solar + commercial EV — the cost-killer combo

Pairing your commercial solar installation with workplace EV chargepoints is the single most cost-effective fleet energy decision available in 2026:

  • Generated solar that would otherwise be exported at SEG rate (~6-15p/kWh) instead charges your fleet at near-zero marginal cost
  • Your fleet running cost-per-mile drops to typically 2-4p/mile vs. 12-18p/mile on grid power
  • Excess generation still exported at SEG rate — solar is never wasted

We can quote both as a combined project — single survey, single project manager, one invoice.

Planning & DNO

We handle all planning and DNO paperwork for commercial installs:

  • Planning permission: rarely required for car park chargers under permitted development rights. Listed buildings and conservation areas are exceptions.
  • DNO application: required for most installs over 3 chargers or where the cumulative load exceeds your existing supply. Typical response time 6-8 weeks for larger applications. We submit and chase on your behalf.
  • Building Control: Part P notification handled for all installs.

Costs

Single commercial point
From £900
Installed and certified, before any grant
10-unit car park
From £9,000
Before any grant; with load balancing
WCS grant (you claim)
Up to £500
Per socket, max 40 sockets, to 31 Mar 2027

Get a commercial EV charging quote

Free site survey across Milton Keynes and Buckinghamshire.

Request Site Survey

Frequently Asked Questions

How much is the Workplace Charging Scheme grant?
Up to £500 per socket, up to 40 sockets per business, and it runs to 31 March 2027. You claim it yourself — we are not authorised for you.
Do I need planning permission for commercial EV chargers?
Almost never for car park installations under permitted development rights. Listed buildings and conservation areas are exceptions — we'll check during the survey.
Will I need a DNO upgrade for multiple chargers?
Often not, if we use load balancing. Smart load management lets you install many chargers without upgrading your supply. We assess this at site survey.
Do you claim the Workplace Charging Scheme for us?
No. Depth of Light is OZEV-authorised for residential schemes only, so the workplace claim is one you make yourself. We install and certify the chargepoints.
What's OCPP and do I need it?
OCPP (Open Charge Point Protocol) means your chargers can be managed by any compatible software. We install OCPP-compatible hardware so you're not locked into a single supplier's app or platform.
How long does a commercial install take?
1 day for a single point, 2-3 days for a 6-10 unit installation, longer for larger sites. We work around your business operations to minimise disruption.

Ready to get started?

Free no-obligation quotes from your local MCS & NAPIT certified installer in Milton Keynes and Buckinghamshire.